PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Continued installing overhead conduit for the 2nd Floor Facing East  (800x600).jpg Electrical conduit at the Elect. Room 284 Facing West (800x600).jpg Installing piping hangers Facing East (800x600).jpg Wire mesh and rebar at the 3rd floor slab on deck Facing South-East (800x600).jpg
Next page Continued installing overhead conduit for the 2nd Floor Facing East  (800x600)
Continued installing overhead conduit for the 2nd Floor Facing East (800x600)